Find your dream job faster with JobLogr
AI-powered job search, resume help, and more.
Try for Free
GE

Generac

via ZipRecruiter

All our jobs are verified from trusted employers and sources. We connect to legitimate platforms only.

Data Center Construction Integration Manager - Constructiv

Richardson, TX
Full-time
Posted 12/12/2025
Verified Source
Key Skills:
Construction Management
Data Center Infrastructure
Project Coordination
Technical Documentation
Safety Protocols

Compensation

Salary Range

$91K - 137K a year

Responsibilities

Oversee data center integration processes, manage cross-functional teams, ensure compliance with technical specifications, promote safety, and track project progress.

Requirements

Minimum 5-7 years in data center or mission-critical construction, experience with telecom and network system integration, proficiency in enterprise tools like Microsoft Office 365, and relevant certifications.

Full Description

We are Constructiv, a Generac Company, empowering your technology through mission critical infrastructure delivery. Our team has over 20 years of technical project delivery experience. During this period, we have established a standard for building the critical power and cooling infrastructure that supports data centers As we continue to expand,Constructivis building a pipeline of skilled construction professionals for future opportunities in the United States. While we currently do not have immediate openings, we want to connect with talented individuals in the data center construction industry who are open to exploring roles with us when the time is right.Travel: Travel is required - up to 90%. 90% is required due to assignment being on site/physical location, living in temporary housing. Onsite is Monday - Friday with occasional off hours work, nights and weekends as needed.Current focus is on candidates located in the following areas:Phoenix, AZAshburn, VAHouston, TX Roles and Responsibilities: • Oversee the full integration process post base-building completion to ensure data centers are "Ready for Network Install" (RNI) and "Ready for Server Install" (RSI). • Lead cross-functional teams including general contractors, lease providers, and internal stakeholders to meet critical project milestones and handoffs. • Manage installation and commissioning (Cx) of network infrastructure systems including WAN, LAN, and WLAN. Ensure compliance with technical specifications and timelines. • Actively promote and enforce a culture of safety on-site, ensuring all work is conducted in alignment with established safety protocols. • Daily Operations: • 45% Onsite fieldwork including site walks, progress checks, and safety meetings with field teams. • 55% Documentation tasks including checklists, reports, and milestone tracking using enterprise tools (O365, etc.). • Engage with internal teams such as Data Center Operations (DC Ops), End-to-End Delivery (E2E), Security, Engineering, Site Acquisition, and EHS to drive alignment and progress. • Track and report on project status, RFIs, constraints, dependencies, and safety compliance. Provide weekly updates in accordance with organizational standards. • Meeting project deadlines aligned with business and customer needs. • Promoting and maintaining a safe working environment. Minimum Qualifications: • High school diploma or GED required. • 5-7 years of experience in data center or mission-critical construction project management. • 5+ years in Construction Management, Documentation & Professional Communication & Telecom/Network System Integration • Proven ability to lead integration of telecom and network systems in large-scale construction projects. • Proficiency in analyzing project schedules and tracking technical scope. Knowledge / Skills / Abilities • Excellent documentation and professional communication skills. • Advanced experience with Microsoft Office 365 or equivalent enterprise tools. Preferred Qualifications: • Degree in Construction Management, Telecommunications, Engineering, or a related field. • PMP, LEED, or RCDD certification. • OSHA 30 and/or NFPA 70E certification. • PMI- PMP (Project Management Professional) • BICSI- DCDC (Data Center Design Consultant) • Uptime Institute ATD (Accredited Tier Designer) Work Experience • Familiarity with commercial lease agreements and associated construction deliverables. Compensation: Constructiv is committed to fair and equitable compensation practices. The annual salary for this role is $91,300 - $136,900. This compensation will ultimately be in line with the location in which the position is filled. Final compensation for this role will be determined by various factors such as a candidate's relevant work experience, skills, certifications, and geographic location. This role is eligible for variable compensation including short term and long-term incentives. Physical Demands: While performing the duties of this job, the employee is regularly required to talk and hear; and use hands to manipulate objects or controls. The employee is regularly required to stand and walk. On occasion the incumbent may be required to stoop, bend or reach above the shoulders. The employee must occasionally lift up to 25 pounds. Specific conditions of this job are typical of frequent and continuous computer-based work requiring periods of sitting, close vision and ability to adjust focus. Occasional travel. "We are an equal opportunity employer and all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, sexual orientation, national origin, disability status, protected veteran status, or any other characteristic protected by law."

This job posting was last updated on 12/12/2025

Ready to have AI work for you in your job search?

Sign-up for free and start using JobLogr today!

Get Started »
JobLogr badgeTinyLaunch BadgeJobLogr - AI Job Search Tools to Land Your Next Job Faster than Ever | Product Hunt